Client: Whittlebury Park

This job consisted of a development of two extensions where we were commissioned to install the complete plumbing system.

The first extension was a block of accommodation with 12 bedrooms, all with en-suite bathrooms, radiator central heating, running off an Intergas boiler. The hot water system was run from a Andrews water heater

The second extension featured the same systems but with 18 bedrooms, again all with en suite bathrooms.